|
Project Summary |
2016年11月22日 星期二 08:55 |
|
|
Week 3: LO 1 Understand the maintenance function |
Maintenance Functions Exercise |
- |
|
|
|
Week 4&5: LO 1 Understand the maintenance function |
Activity 29.1B Condition Monitoring |
- |
|
|
|
Week 6-8: LO 2 Understand lubricants and lubrication systems |
Activity 1 Lubrication, Friction and Wear |
- |
|
|
|
Activity 2 Forms of Film Condition and Lubrication Selection |
- |
|
|
|
Activity 3 Characteristics and Properties of Greases and Oils |
- |
|
|
|
Activity 4 Liquid Lubricant, Greases and Semi Solid Lubricants |
- |
|
|
|
Week 10-12: LO 5 Understand seals and sealing principles |
Seals Activity |
- |
|
|
|
Week 13 - 16: LO 3 Understand bearing operations, types, materials and causes of failure |
Different Types of Bearing Activity |
- |
|
|
|
Bearings Failure Activity |
- |
|
|
|
Induction Heater Activity |
- |
|
|
|
Bearings Quiz |
- |
|
|
|
Week 17 - 18: LO 4 Understand power transmissions, principles of operation and failure patterns of Belt Drives |
Compound Flat Belt Drive Calculation Worksheet |
- |
|
|
|
Open Belt Pulley Calculation Worksheet |
- |
|
|
|
Crossed Belt Calculation Worksheet |
- |
|
|
|
Week 24-25: LO 4 Understand power transmissions, principles of operation and failure patterns of COUPLINGS |
Coupling Alignment PowerPoint Upload Point |
- |
|
|
|
Practical Assessments & Project Upload Point |
MIG 101 Alignment of Two Shafts With a Rigid Coupling. |
- |
|
|
|
MIG 102 Dismantling and Re-Assembly of an Air Compressor |
- |
|
|
|
MIG 103 Power Transmission Investigation. |
- |
|
|
|
MIG 104 Strip and Rebuild of Hydraulic Cylinder |
- |
|
|
|
MIG 105 or MIG 106 Dismantling and Re-assembling a 'Split' Cooper Bearing. |
- |
|
|
|
MIG 107 Strip and Rebuild of a Diaphragm Pump |
- |
|
|
|
MIG 108 Dismantling and Reassembly of a Plummer Block |
- |
|
|
|
Upload your Maintenance Project here |
- |
|
|